Project Details

ASPHALT PAVEMENT RESURFACING IN KINGS, QUEENS, BRONX & RICHMOND COS NYC

Project ID No. XM2543 , Contract Number D265672

Description

The project will resurface asphalt pavement on state highway systems in the Bronx, Kings, Queens, and Richmond counties of New York City. Work includes repairing and resurfacing asphalt pavement showing signs of distress and deterioration due to normal wear and tear, aging and/or climatic conditions.

Project Overview

Project Status

  • The project has been Under Construction.
  • The Bid Opening was on 03/12/2026

Project Schedule

Award of Contract Original Contract Completion Date* Estimated Substantial Completion Date* Construction Schedule Variance from Contract Award**
04/21/2026 07/25/2028 04/25/2028 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$33,002,581 $0 $33,002,581 Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: No

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the NEW YORK CITY region and includes the following:

Counties
BRONX
KINGS
QUEENS
RICHMOND

Cities
NEW YORK

11 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
5th Congressional District (Gregory Meeks)
6th Congressional District (Grace Meng)
7th Congressional District (Nydia Velazquez)
8th Congressional District (Hakeem Jeffries)
9th Congressional District (Yvette Clarke)
11th Congressional District (Nicole Malliotakis)
14th Congressional District (Alexandria Ocasio-Cortez)
15th Congressional District (Ritchie Torres)

State Senatorial District(s)
12th Senatorial District (Michael Gianaris)
14th Senatorial District (Leroy Comrie)
15th Senatorial District (Joseph P. Addabbo Jr.)
16th Senatorial District (John C. Liu)
18th Senatorial District (Julia Salazar)
20th Senatorial District (Zellnor Myrie)
21th Senatorial District (Kevin S. Parker)
22th Senatorial District (Sam Sutton)
23th Senatorial District (Jessica Scarcella-Spanton)
24th Senatorial District (Andrew J. Lanza)
29th Senatorial District (Jose M. Serrano)
32th Senatorial District (Luis R. Sepulveda)
33th Senatorial District (Gustavo Rivera)
34th Senatorial District (Nathalia Fernandez)
36th Senatorial District (Jamaal T. Bailey)

State Assembly District(s)
025th Assembly District (Nily Rozic)
028th Assembly District (Andrew Hevesi)
037th Assembly District (Claire Valdez)
038th Assembly District (Jenifer Rajkumar)
044th Assembly District (Robert C. Carroll)
045th Assembly District (Michael Novakhov)
048th Assembly District (Simcha Eichenstein)
061th Assembly District (Charles D. Fall)
062th Assembly District (Michael Reilly)
063th Assembly District (Sam Pirozzolo)
078th Assembly District (George Alvarez)
080th Assembly District (John Zaccaro, Jr.)
081th Assembly District (Jeffrey Dinowitz)
085th Assembly District (Emerita Torres)
087th Assembly District (Karines Reyes)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Rolando Infante
4740 21st Street, Room 860
Long Island City, NY 10038
Phone: 718-482-4528
Email: rolando.infante@dot.ny.gov
Provide feedback on this project