BRIDGE PAINTING AT VARIOUS LOCATIONS IN BRONX, QUEENS, KINGS & RICHMOND COUNTIES, NYC
Project ID No. XM2403 , Contract Number D265235
Description
This project will perform total painting of superstructure/substructure structural steel for twenty (20) bridges in Bronx, Kings, Queens, and Richmond Counties, NYC to preserve the structural steel and prolong the service life of the existing steel. It is expected that some limited steel repair work will be required to address structural steel elements that exhibit section loss or significant corrosion.
Project Overview
Project Status
- The project has been Under Construction.
- The Bid Opening was on 07/11/2024
Project Schedule
| Award of Contract | Original Contract Completion Date* | Estimated Substantial Completion Date* | Construction Schedule Variance from Contract Award** |
|---|---|---|---|
| 08/21/2024 | 11/30/2026 | 10/31/2026 |
|
**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
| Contract Award Cost | Approved Cost Changes | Current Construction Contract Cost | Cost Variance of Construction Contract** |
|---|---|---|---|
| $23,872,227 | $0 | $23,872,227 |
|
**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost
This project receives funding from the following sources:
Federal: Yes
State: Yes
Local: No
*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
Location
This project is located in the NEW YORK CITY region and includes the following:
Counties
BRONX
KINGS
QUEENS
RICHMOND
Cities
NEW YORK
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
6th Congressional District (Grace Meng)
7th Congressional District (Nydia Velazquez)
11th Congressional District (Nicole Malliotakis)
14th Congressional District (Alexandria Ocasio-Cortez)
15th Congressional District (Ritchie Torres)
State Senatorial District(s)
16th Senatorial District (John C. Liu)
17th Senatorial District (Stephen T. Chan)
18th Senatorial District (Julia Salazar)
24th Senatorial District (Andrew J. Lanza)
29th Senatorial District (Jose M. Serrano)
32th Senatorial District (Luis R. Sepulveda)
34th Senatorial District (Nathalia Fernandez)
State Assembly District(s)
025th Assembly District (Nily Rozic)
027th Assembly District (Sam Berger)
046th Assembly District (Alec Brook-Krasny)
049th Assembly District (Lester Chang)
050th Assembly District (Emily Gallagher)
053th Assembly District (Maritza Davila)
062th Assembly District (Michael Reilly)
077th Assembly District (Landon C. Dais)
082th Assembly District (Michael Benedetto)
085th Assembly District (Emerita Torres)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us:
4740 21st Street, Room 860
Long Island City, NY 10038
Phone: 718-482-4528
Email: rolando.infante@dot.ny.gov