Project Details

PAVEMENT PRESERVATION (ASPHALT)

Project ID No. XM2248 , Contract Number D264972

Description

Maintenance repair/resurfacing of deteriorated sections of asphalt pavement on State Highway System in New York City.

Project Overview

Project Status

  • The project has been Completed Project.
  • The Bid Opening was on 02/02/2023

Project Schedule

Award of Contract Original Contract Completion Date* Substantially Completed Construction Schedule Variance from Contract Award**
04/20/2023 05/02/2025 12/06/2024 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$23,288,606 N/A N/A Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: No

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the NEW YORK CITY region and includes the following:

Counties
BRONX
NEW YORK
QUEENS
RICHMOND

Cities
NEW YORK

11 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
3rd Congressional District (Thomas R. Suozzi)
6th Congressional District (Grace Meng)
11th Congressional District (Nicole Malliotakis)
13th Congressional District (Adriano Espaillat)
14th Congressional District (Alexandria Ocasio-Cortez)
15th Congressional District (Ritchie Torres)

State Senatorial District(s)
11th Senatorial District (Toby Ann Stavisky)
16th Senatorial District (John C. Liu)
24th Senatorial District (Andrew J. Lanza)
29th Senatorial District (Jose M. Serrano)
31th Senatorial District (Robert Jackson)
34th Senatorial District (Nathalia Fernandez)

State Assembly District(s)
027th Assembly District (Sam Berger)
040th Assembly District (Ron Kim)
061th Assembly District (Charles D. Fall)
063th Assembly District (Sam Pirozzolo)
071th Assembly District (Al Taylor)
082th Assembly District (Michael Benedetto)
084th Assembly District (Amanda Septimo)
087th Assembly District (Karines Reyes)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Rolando Infante
4740 21st Street, Room 860
Long Island City, NY 10038
Phone: 718-482-4528
Email: rolando.infante@dot.ny.gov
Provide feedback on this project