Project Details

PAVEMENT PRESERVATION MAINTENANCE PROJECT

Project ID No. XM1849 , Contract Number D263772

Description

This project will replace and install new asphalt pavement and perform underlying concrete repair on state highway roadways at various locations in the Boroughs of Manhattan, Bronx, Queens, Brooklyn, and Staten Island, New York City.

Project Overview

Project Status

  • The project has been Completed Project.
  • The Bid Opening was on 08/09/2018

Project Schedule

Award of Contract Original Contract Completion Date* Substantially Completed Construction Schedule Variance from Contract Award**
10/04/2018 03/31/2021 06/07/2021 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$26,715,992 N/A N/A Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: No

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the NEW YORK CITY region and includes the following:

Counties
BRONX
NEW YORK
QUEENS

Cities
NEW YORK

11 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
5th Congressional District (Gregory Meeks)
6th Congressional District (Grace Meng)
7th Congressional District (Nydia Velazquez)
13th Congressional District (Adriano Espaillat)
14th Congressional District (Alexandria Ocasio-Cortez)

State Senatorial District(s)
10th Senatorial District (James Sanders Jr.)
12th Senatorial District (Michael Gianaris)
13th Senatorial District (Jessica Ramos)
14th Senatorial District (Leroy Comrie)
15th Senatorial District (Joseph P. Addabbo Jr.)
31th Senatorial District (Robert Jackson)
34th Senatorial District (Nathalia Fernandez)

State Assembly District(s)
024th Assembly District (David I. Weprin)
025th Assembly District (Nily Rozic)
030th Assembly District (Steven Raga)
031th Assembly District (Khaleel M. Anderson)
035th Assembly District (Larinda C. Hooks)
037th Assembly District (Claire Valdez)
039th Assembly District (Catalina Cruz)
071th Assembly District (Al Taylor)
082th Assembly District (Michael Benedetto)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Rolando Infante
4740 21st Street, Room 860
Long Island City, NY 10038
Phone: 718-482-4528
Email: rolando.infante@dot.ny.gov
Provide feedback on this project