REHAB 3 BR'S AT LIE/GCP INTERCHANGE. QUEENS CO, NY
Project ID No. X80661 , Contract Number D262699
Description
This project calls for the superstructure replacement of 3 bridges which are located in the Long Island Expressway (LIE)/Grand Central Parkway (GCP)Interchange. These bridges are: L I E mainline over the GCP, LIE Westbound Collector distributor (CD) Road over the GCP, and LIE eastbound collector distributor Road over the GCP . The limits of the project along the LIE are approximately at or near the 112th Street Pedestrian Bridge to the Flushing Meadow Park Bridge in Queens County. Not addressing these conditions may result in bridge closures or unsafe conditions. Also resurfacing and repairs along Long Island Expressway between Grand Central Parkway and College Point Blvd. in NYC. Resurfacing & deck repairs along Long Island Expressway (I-495) between Grand Central Parkway and College point Blvd in New York City
Project Overview
Project Status
- The project has been Completed Project.
- The Bid Opening was on 12/04/2014
Project Schedule
| Award of Contract | Original Contract Completion Date* | Substantially Completed | Construction Schedule Variance from Contract Award** |
|---|---|---|---|
| 02/02/2015 | 01/01/2019 | 01/01/2019 |
|
**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
| Contract Award Cost | Approved Cost Changes | Current Construction Contract Cost | Cost Variance of Construction Contract** |
|---|---|---|---|
| $55,027,000 | N/A | N/A |
|
**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost
This project receives funding from the following sources:
Federal: Yes
State: Yes
Local: No
*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
Location
This project is located in the NEW YORK CITY region and includes the following:
Counties
QUEENS
Cities
NEW YORK
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
6th Congressional District (Grace Meng)
State Senatorial District(s)
13th Senatorial District (Jessica Ramos)
14th Senatorial District (Leroy Comrie)
16th Senatorial District (John C. Liu)
State Assembly District(s)
025th Assembly District (Nily Rozic)
027th Assembly District (Sam Berger)
035th Assembly District (Larinda C. Hooks)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us:
4740 21st Street, Room 860
Long Island City, NY 10038
Phone: 718-482-4528
Email: rolando.infante@dot.ny.gov