Project Status
- The project has been Completed Project.
- The Bid Opening was on 09/20/2007
Project Schedule
| Award of Contract | Original Contract Completion Date* | Substantially Completed | Construction Schedule Variance from Contract Award** |
|---|---|---|---|
| 02/29/2008 | 08/30/2010 | N/A |
|
**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
| Contract Award Cost | Approved Cost Changes | Current Construction Contract Cost | Cost Variance of Construction Contract** |
|---|---|---|---|
| $15,854,886 | N/A | N/A |
|
**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost
This project receives funding from the following sources:
Federal: Yes
State: Yes
Local: No
*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
Location
This project is located in the NEW YORK CITY region and includes the following:
Counties
BRONX
Cities
NEW YORK
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
14th Congressional District (Alexandria Ocasio-Cortez)
15th Congressional District (Ritchie Torres)
16th Congressional District (George Latimer)
State Senatorial District(s)
32th Senatorial District (Luis R. Sepulveda)
33th Senatorial District (Gustavo Rivera)
34th Senatorial District (Nathalia Fernandez)
35th Senatorial District (Andrea Stewart-Cousins)
36th Senatorial District (Jamaal T. Bailey)
State Assembly District(s)
078th Assembly District (George Alvarez)
080th Assembly District (John Zaccaro, Jr.)
081th Assembly District (Jeffrey Dinowitz)
082th Assembly District (Michael Benedetto)
085th Assembly District (Emerita Torres)
087th Assembly District (Karines Reyes)
088th Assembly District (Amy Paulin)
089th Assembly District (J. Gary Pretlow)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us:
4740 21st Street, Room 860
Long Island City, NY 10038
Phone: 718-482-4528
Email: rolando.infante@dot.ny.gov