Project Details

KGI, REPLACE & REHAB BRIDGES ALONG VAN WYCK EXPY. QNS, NYC

Project ID No. X73556 , Contract Number D261344

Description

Add auxiliary lane North bound from Main Street to the diverge with Grand Central Parkway exits. Add auxiliary lane southbound from merge point (Grand Central Parkway) to exit for Hillside (Direct Service Road Connection). Replace Queens Boulevard Bridge over the Vanwyck Expressway to alleviate the operational deficiencies on the Vanwyck Expressway. Widen Vanwyck Expressway bridge over southbound Main Street to allow for the auxiliary lane northbound. Reconstruct Queens Boulevard over Main Street .Replace the exit ramp from Northbound Van Wyck Expressway, to Westbound Queens Boulevard. Replace Hoover Avenue Bridge, Replace the 82nd Avenue Pedestrian Bridge., Queens county for operational and safety improvements.

Project Overview

Project Status

  • The project has been Completed Project.
  • The Bid Opening was on 03/04/2010

Project Schedule

Award of Contract Original Contract Completion Date* Substantially Completed Construction Schedule Variance from Contract Award**
07/01/2010 01/30/2015 05/31/2017 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$146,592,130 N/A N/A Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: Yes

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the NEW YORK CITY region and includes the following:

Counties
QUEENS

Cities
NEW YORK

11 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
5th Congressional District (Gregory Meeks)
6th Congressional District (Grace Meng)

State Senatorial District(s)
14th Senatorial District (Leroy Comrie)

State Assembly District(s)
024th Assembly District (David I. Weprin)
025th Assembly District (Nily Rozic)
027th Assembly District (Sam Berger)
028th Assembly District (Andrew Hevesi)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Rolando Infante
4740 21st Street, Room 860
Long Island City, NY 10038
Phone: 718-482-4528
Email: rolando.infante@dot.ny.gov
Provide feedback on this project