Project Details

DECK REPLACEMENT OF FIVE BRIDGES ON I-278, KINGS & RICHMOND

Project ID No. X73147 , Contract Number D900041

Description

This project will repair the bridge steel and concrete elements such as the concrete deck, concrete substructures, bridge bearings and other deteriorated elements on Staten Island Expressway (I-278) bridges: Wesbound over Mosel Avenue Westbound; Eastbound over Mosel Avenue; Westbound over Staten Island Rapid Transit (SIRT); and Eastbound over SIRT in the Borough of Staten Island, New York City.

Project Overview

Project Status

  • The project has been Completed Project.
  • The Bid Opening was on 04/13/2018

Project Schedule

Award of Contract Original Contract Completion Date* Substantially Completed Construction Schedule Variance from Contract Award**
07/23/2018 01/23/2020 10/31/2020 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$77,969,790 N/A N/A Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the NEW YORK CITY region and includes the following:

Counties
KINGS
RICHMOND

Cities
NEW YORK

11 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
11th Congressional District (Nicole Malliotakis)

State Senatorial District(s)
23th Senatorial District (Jessica Scarcella-Spanton)
26th Senatorial District (Andrew Gounardes)

State Assembly District(s)
046th Assembly District (Alec Brook-Krasny)
063th Assembly District (Sam Pirozzolo)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Rolando Infante
4740 21st Street, Room 860
Long Island City, NY 10038
Phone: 718-482-4528
Email: rolando.infante@dot.ny.gov
Provide feedback on this project