Project Details

SAFETY AND MOBILITY IMPROVEMENTS ON EASTBOUND GRAND CENTRAL PARKWAY AT LIE INTERCHANGE

Project ID No. X05174 , Contract Number D265247

Description

This project will reconstruct the entrance ramp from eastbound Long Island Expressway to eastbound Grand Central Parkway to improve the safety and mobility of the merge. The project will also address the substandard guiderail, signing, and curbing along the roadway. There will also be drainage improvements for the ramp to reduce the likelihood of flooding.

Project Overview

Project Status

  • The project has been Under Construction.
  • The Bid Opening was on 06/20/2024

Project Schedule

Award of Contract Original Contract Completion Date* Estimated Substantial Completion Date* Construction Schedule Variance from Contract Award**
08/02/2024 04/23/2026 N/A Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$14,885,000 $7 $14,885,007 Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the NEW YORK CITY region and includes the following:

Counties
QUEENS

Cities
NEW YORK

11 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
6th Congressional District (Grace Meng)

State Senatorial District(s)
13th Senatorial District (Jessica Ramos)
14th Senatorial District (Leroy Comrie)
16th Senatorial District (John C. Liu)

State Assembly District(s)
027th Assembly District (Sam Berger)
035th Assembly District (Larinda C. Hooks)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Rolando Infante
4740 21st Street, Room 860
Long Island City, NY 10038
Phone: 718-482-4528
Email: rolando.infante@dot.ny.gov
Provide feedback on this project