RESURFACING OF THE ROUTE 9A BIKEWAY, NEW YORK CO, NYC
Project ID No. X02446 , Contract Number D264772
Description
REPLACING THE ASPHALT PAVEMENT RIDING SURFACE ON THE BIKEWAY WITH A NEW ASPHALT RIDING SURFACE.
Project Overview
Project Status
- The project has been Completed Project.
- The Bid Opening was on 08/03/2022
Project Schedule
| Award of Contract | Original Contract Completion Date* | Substantially Completed | Construction Schedule Variance from Contract Award** |
|---|---|---|---|
| 10/06/2022 | 10/30/2023 | 11/03/2023 |
|
**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
| Contract Award Cost | Approved Cost Changes | Current Construction Contract Cost | Cost Variance of Construction Contract** |
|---|---|---|---|
| $6,942,687 | N/A | N/A |
|
**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost
This project receives funding from the following sources:
Federal: Yes
State: Yes
Local: No
*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
Location
This project is located in the NEW YORK CITY region and includes the following:
Counties
NEW YORK
Cities
NEW YORK
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
10th Congressional District (Daniel Goldman)
12th Congressional District (Jerrold Nadler)
State Senatorial District(s)
27th Senatorial District (Brian Kavanagh)
47th Senatorial District (Erik Bottcher)
State Assembly District(s)
061th Assembly District (Charles D. Fall)
066th Assembly District (Deborah J. Glick)
067th Assembly District (Linda B. Rosenthal)
075th Assembly District (Tony Simone)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us:
4740 21st Street, Room 860
Long Island City, NY 10038
Phone: 718-482-4528
Email: rolando.infante@dot.ny.gov