LARGE CULVERT PROJECT FFY28
Project ID No. 9TCR28
Description
This project addresses 9 large culverts on roadways on the NHS: 5 culverts located on Interstate 81 in the town of Kirkwood, Broome County, 1 culvert located on Interstate 81 in the town of Barker, Broome County, 1 culvert located on Route 991L in the village of Afton, Chenango County, 1 culvert located on Route 17 in the town of Hancock, Delaware County, and 1 culvert located on Route 28 in the town of Meredith, Delaware County. This culvert project focuses on safety, infrastructure and hydraulic resiliency in support of the state's economic and environmental stewardship responsibilities.
Project Overview
Project Status
- The current status of the project is In Development.
- The Bid Opening is expected to be in Winter 2027/2028.
- Construction is expected to begin in Spring 2028.
- Construction is expected to be completed in Fall 2028.
Cost of the Project
The project cost is approximately $7,000,000 .
This project receives funding from the following sources:
Federal: Yes
State : Yes
Local : No
The scheduled dates shown are approximations only. For more detailed information, please utilize the "Contact Us" information provided.
Location
This project is located in the SOUTHERN TIER region and includes the following:
Counties
BROOME
CHENANGO
DELAWARE
Towns
AFTON
BARKER
HANCOCK
KIRKWOOD
MEREDITH
Villages
AFTON
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
19th Congressional District (Josh Riley)
State Senatorial District(s)
51th Senatorial District (Peter Oberacker)
State Assembly District(s)
101th Assembly District (Brian Maher)
102th Assembly District (Chris Tague)
121th Assembly District (Joe Angelino)
124th Assembly District (Christopher S. Friend)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us:
44 Hawley Street
Binghamton, NY 13901
Phone: 607-721-8116
Email: r9projects@dot.ny.gov