Project Details

LOFT RD OVER SCHENEVUS CREEK BRIDGE REPLACEMENT, BNY 2021

Project ID No. 975519

Description

This project replaces the bridge that carries Loft Rd over Schenevus Creek, in the town of Maryland, Otsego County. A standard two-lane multi-girder bridge replaces the existing single span one-lane bridge. The project involves adequately lengthening the bridge span and adds new abutments founded on piles with scour protection.

Issue Description:
Minor roadway alignment modifications will be investigated to improve safety at approaches. A hydraulic study will be performed to ensure the new bridge hydraulic opening is properly sized. If determined necessary by the hydraulic study, a vertical realignment of the roadway will be investigated to provide adequate freeboard. The project may require a temporary structure during construction to maintain access.

Project Overview

Project Status

  • The project has been Under Construction.
  • The Bid Opening was on 07/09/2026

Project Schedule

Award of Contract Original Contract Completion Date* Estimated Substantial Completion Date* Construction Schedule Variance from Contract Award**
09/21/2026 N/A N/A Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
N/A N/A N/A Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: Yes

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the SOUTHERN TIER region and includes the following:

Counties
OTSEGO

Towns
MARYLAND

09 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
21th Congressional District (Elise Stefanik)

State Senatorial District(s)
51th Senatorial District (Peter Oberacker)

State Assembly District(s)
102th Assembly District (Chris Tague)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Region 9 Regional Director's Office
44 Hawley Street
Binghamton, NY 13901
Phone: 607-721-8116
Email: r9projects@dot.ny.gov