I81 RESURFACING, EXIT 13B (OLD EXIT 5) TO EXIT 21 (OLD EXIT 7), BROOME COUNTY

Project ID No. 950129 , Contract Number D265682

Description

This project mills and resurfaces the asphalt pavement and shoulders of Interstate 81 with a single course WMA (Warm-Mix Asphalt) top course.  Additional work includes isolated pavement repairs, guide railing replacement, the installation of new pavement markings and MIARDs (Milled-In Audible Delineators), and addresses SAFETAP (Safety Appurtenance Program) items as necessary.  Ramps at exits 13B (old exit 5) and Exit 21 (old exit 7) and the Interstate 88 interchange are also included in the project limits.  Towns of Dickinson, Chenango and Barker, Broome County.

Project Overview

Project Status

  • The project has been Under Construction.
  • The Bid Opening was on 02/05/2026

Project Schedule

Award of Contract Original Contract Completion Date* Estimated Substantial Completion Date* Construction Schedule Variance from Contract Award**
03/04/2026 12/04/2026 12/04/2026 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$18,621,020 $0 $18,621,020 Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the SOUTHERN TIER region and includes the following:

Counties
BROOME

Cities
BINGHAMTON

Towns
BARKER
CHENANGO
DICKINSON

09 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
19th Congressional District (Josh Riley)

State Senatorial District(s)
51th Senatorial District (Peter Oberacker)
52th Senatorial District (Lea Webb)

State Assembly District(s)
121th Assembly District (Joe Angelino)
123th Assembly District (Donna A. Lupardo)
124th Assembly District (Christopher S. Friend)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Region 9 Regional Director's Office
44 Hawley Street
Binghamton, NY 13901
Phone: 607-721-8116
Email: r9projects@dot.ny.gov