RT 7 / RT 23 / MAPLE STREET, CITY OF ONEONTA, INTERSECTION RECONSTRUCTION
Project ID No. 930725 , Contract Number D265369
Description
This project reconstructs the intersection Route 7 (aka Main Street), Route 23 and Maple Street into a roundabout configuration. City of Oneonta, Otsego County.
Issue Description:
The roundabout preliminary design does not require ROW purchase for the footprint of the new intersection. Easements could be required simply to reconstruct or alter existing sidewalks. Low cost pedestrian safety improvements on the Lettice highway should be scoped in conjunction with this project. Jim E. confirmed that a sidewalk could be placed on the shoulder of the bridges (loading wise). The median can be narrowed to maintain two travel lanes or the section can be reduced to a single lane thru the bridges and widened out for the intersections at either end.
Project Overview
Project Status
- The project has been Under Construction.
- The Bid Opening was on 01/23/2025
Project Schedule
| Award of Contract | Original Contract Completion Date* | Estimated Substantial Completion Date* | Construction Schedule Variance from Contract Award** |
|---|---|---|---|
| 02/06/2025 | 02/17/2026 | N/A |
|
**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
| Contract Award Cost | Approved Cost Changes | Current Construction Contract Cost | Cost Variance of Construction Contract** |
|---|---|---|---|
| $4,057,705 | $41,919 | $4,099,624 |
|
**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost
This project receives funding from the following sources:
Federal: Yes
State: Yes
Local: No
*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
Location
This project is located in the SOUTHERN TIER region and includes the following:
Counties
OTSEGO
Cities
ONEONTA
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
19th Congressional District (Josh Riley)
State Senatorial District(s)
51th Senatorial District (Peter Oberacker)
State Assembly District(s)
122th Assembly District (Brian D. Miller)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Community Outreach
Additional Info/Links
This project reconstructs the intersection of State Route 7 (Main Street), NY Route 23 and Maple Street in the City of Oneonta, Otsego County into a roundabout configuration.
A public information meeting was held on Tuesday, November 14, 2023 at the Oneonta High School Auditorium and made available online for remote participants.
Public meeting materials and a copy of the signed Design Approval Document with Appendices are available on the Community Outreach page.