Project Details

RT 17 APALACHIN TO BROOME COUNTY LINE, CRACK & SEAT

Project ID No. 906782 , Contract Number D265091

Description

This project crack and seats and overlays Route 17 from Apalachin to the Broome County line.and includes 2 Bridge deck replacements.  Additional work  on Route 17 includes repairing 27 culverts, adding guide rails, drainage and ground-mounted sign structure upgrades. SAFETAP items are also addressed. This project also mills and resurfaces the asphalt pavement and shoulders on Rt. 962J (Valley View Drive with bicycle and pedestrian facilities improvements and newly resurfaced shoulders and pavement markings and traffic signal loop replacements.  Town of Owego, Tioga County.

Project Overview

Project Status

  • The project has been Under Construction.
  • The Bid Opening was on 10/26/2023

Project Schedule

Award of Contract Original Contract Completion Date* Estimated Substantial Completion Date* Construction Schedule Variance from Contract Award**
12/08/2023 11/17/2025 N/A Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$46,897,583 ($2,417,110) $44,480,473 Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the SOUTHERN TIER region and includes the following:

Counties
TIOGA

Towns
OWEGO

09 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
23th Congressional District (Nicholas Langworthy)

State Senatorial District(s)
58th Senatorial District (Thomas F. O'Mara)

State Assembly District(s)
124th Assembly District (Christopher S. Friend)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Region 9 Regional Director's Office
44 Hawley Street
Binghamton, NY 13901
Phone: 607-721-8116
Email: r9projects@dot.ny.gov
Provide feedback on this project