RT 51 OVER DUNDERBERG CREEK - STORM DAMAGE REPAIR
Project ID No. 900431 , Contract Number D265829
Description
This project makes permanent scour repairs in the vicinity of the bridge carrying Route 51 over Dunderberg Creek, including placement of stone and resetting upstream scour log timbers. Work also includes repair of the upstream parapet/barrier in the bridge since it was destroyed in the flash flood in 2021. Village of Gilbertsville, Otsego County.
Issue Description:
Damage to upstream stone walls, hydraulic vulnerability due to high flow events and preservation of historic structure.
Project Overview
Project Status
- The project has been Under Construction.
- The Bid Opening was on 09/17/2026
Project Schedule
| Award of Contract | Original Contract Completion Date* | Estimated Substantial Completion Date* | Construction Schedule Variance from Contract Award** |
|---|---|---|---|
| 09/25/2026 | 11/27/2027 | 10/27/2027 |
|
**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
| Contract Award Cost | Approved Cost Changes | Current Construction Contract Cost | Cost Variance of Construction Contract** |
|---|---|---|---|
| $1,167,158 | $0 | $1,167,158 |
|
**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost
This project receives funding from the following sources:
Federal: Yes
State: Yes
Local: No
*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
Location
This project is located in the SOUTHERN TIER region and includes the following:
Counties
OTSEGO
Towns
BUTTERNUTS
Villages
GILBERTSVILLE
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
19th Congressional District (Josh Riley)
State Senatorial District(s)
51th Senatorial District (Peter Oberacker)
State Assembly District(s)
121th Assembly District (Joe Angelino)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us:
44 Hawley Street
Binghamton, NY 13901
Phone: 607-721-8116
Email: r9projects@dot.ny.gov