Project Details

CULVERT REHAB/REPLACE: ULSTER COUNTY

Project ID No. 8LC231 , Contract Number D265638

Description

This project will rehabilitate or replace five culverts in Ulster County. The rehabilitations will occur on the culvert that carries US Route 209 over Unknown Stream and the culvert that carries NY Route 213 over Unknown Stream. The replacements will occur on the culverts that carry NY Route 299 over Unknown Stream and two culverts carrying NY Route 28 over Unknown Streams. Work will take place in various municipalities throughout Ulster County.

Project Overview

Project Status

  • The project has been Under Construction.
  • The Bid Opening was on 01/22/2026

Project Schedule

Award of Contract Original Contract Completion Date* Estimated Substantial Completion Date* Construction Schedule Variance from Contract Award**
02/27/2026 11/01/2027 10/01/2027 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$7,221,520 $0 $7,221,520 Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the HUDSON VALLEY region and includes the following:

Counties
ULSTER

Towns
ESOPUS
HURLEY
KINGSTON
LLOYD
SHANDAKEN
ULSTER

08 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
18th Congressional District (Patrick Ryan)
19th Congressional District (Josh Riley)

State Senatorial District(s)
41th Senatorial District (Michelle Hinchey)

State Assembly District(s)
101th Assembly District (Brian Maher)
103th Assembly District (Sarahana Shrestha)
104th Assembly District (Jonathan G. Jacobson)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Region 8 Regional Director's Office
4 Burnett Boulevard
Poughkeepsie, NY 12603
Phone: 845-431-5750
Email: dot.sm.r08.nysdot@dot.ny.gov
Provide feedback on this project