CULVERT REPLACEMENTS: ORANGE AND ULSTER
Project ID No. 8LC211 , Contract Number D265440
Description
This project will replace four culverts in Orange and Ulster counties. The replacements will occur on the culverts that carry State Routes 52, 17K, and 213 over unknown streams and US Route 44 over Twaalfskill Creek. The work will take place throughout various municipalities in Orange and Ulster Counties. Work may include associated guiderail, pavement, and slope repairs associated with replacing the culverts.
Project Overview
Project Status
- The project has been Under Construction.
- The Bid Opening was on 03/27/2025
Project Schedule
| Award of Contract | Original Contract Completion Date* | Estimated Substantial Completion Date* | Construction Schedule Variance from Contract Award** |
|---|---|---|---|
| 05/15/2025 | 12/31/2026 | 12/01/2026 |
|
**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
| Contract Award Cost | Approved Cost Changes | Current Construction Contract Cost | Cost Variance of Construction Contract** |
|---|---|---|---|
| $5,665,000 | $83,965 | $5,748,965 |
|
**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost
This project receives funding from the following sources:
Federal: Yes
State: Yes
Local: No
*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
Location
This project is located in the HUDSON VALLEY region and includes the following:
Counties
ORANGE
ULSTER
Towns
CRAWFORD
LLOYD
MARBLETOWN
SHAWANGUNK
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
18th Congressional District (Patrick Ryan)
State Senatorial District(s)
41th Senatorial District (Michelle Hinchey)
42th Senatorial District (James Skoufis)
51th Senatorial District (Peter Oberacker)
State Assembly District(s)
101th Assembly District (Brian Maher)
103th Assembly District (Sarahana Shrestha)
104th Assembly District (Jonathan G. Jacobson)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us:
4 Burnett Boulevard
Poughkeepsie, NY 12603
Phone: 845-431-5750
Email: dot.sm.r08.nysdot@dot.ny.gov