LOWER HUDSON TRANSIT LINK - TRAFFIC SIGNALS/CAMERAS/VMS
Project ID No. 882373 , Contract Number D264942
Description
The project will include traffic signal and detection improvements, and Variable Message Signs (VMS) along various routes in Rockland and Westchester Counties. This project will build upon the Integrated Corridor Management (ICM) infrastructure that has been previously constructed in the corridor.
Project Overview
Project Status
- The project has been Under Construction.
- The Bid Opening was on 04/20/2023
Project Schedule
| Award of Contract | Original Contract Completion Date* | Estimated Substantial Completion Date* | Construction Schedule Variance from Contract Award** |
|---|---|---|---|
| 06/27/2023 | 03/19/2026 | 04/23/2027 |
|
**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
| Contract Award Cost | Approved Cost Changes | Current Construction Contract Cost | Cost Variance of Construction Contract** |
|---|---|---|---|
| $25,457,636 | $857,239 | $26,314,875 |
|
**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost
This project receives funding from the following sources:
Federal: No
State: Yes
Local: No
*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
Location
This project is located in the HUDSON VALLEY region and includes the following:
Counties
ROCKLAND
WESTCHESTER
Cities
WHITE PLAINS
Towns
CLARKSTOWN
GREENBURGH
HARRISON
MOUNT PLEASANT
NORTH CASTLE
ORANGETOWN
RAMAPO
RYE
Villages
GRAND VIEW-ON-HUDSON
HARRISON
HILLBURN
MONTEBELLO
NYACK
RYE BROOK
SOUTH NYACK
SPRING VALLEY
SUFFERN
TARRYTOWN
AIRMONT
ARDSLEY
CHESTNUT RIDGE
ELMSFORD
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
16th Congressional District (George Latimer)
17th Congressional District (Michael Lawler)
State Senatorial District(s)
35th Senatorial District (Andrea Stewart-Cousins)
37th Senatorial District (Shelley B. Mayer)
38th Senatorial District (Bill Weber)
State Assembly District(s)
091th Assembly District (Steven Otis)
092th Assembly District (MaryJane Shimsky)
093th Assembly District (Chris Burdick)
096th Assembly District (Patrick J. Carroll)
097th Assembly District (Aron Wieder)
098th Assembly District (Karl Brabenec)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us:
4 Burnett Boulevard
Poughkeepsie, NY 12603
Phone: 845-431-5750
Email: dot.sm.r08.nysdot@dot.ny.gov