Project Details

PMI CORRIDOR PAVING AND CATCH BASINS: HUTCHINSON RIVER PARKWAY: MAMARONECK AVE TO CT LINE: WESTCHESTER CO

Project ID No. 881765

Description

This project will repair or replace storm water catch basins and resurface the Hutchinson River Parkway (HRP/ 907W) from Mamaroneck Avenue to the Connecticut State Line to restore the riding surface, preserve the pavement structure and ensure that the drainage system functions as originally designed in the Towns of Harrison, Rye and Scarsdale, Villages of Harrison, Rye Brook and Scarsdale and City of White Plains in Westchester County. Ramps will be included.

Project Overview

Project Status

  • The current status of the project is In Development.
  • The Bid Opening is expected to be in Winter 2026/2027.
  • Construction is expected to begin in Spring 2027.
  • Construction is expected to be completed in Summer 2028.

Cost of the Project

The project cost is approximately $29,000,000 .

This project receives funding from the following sources:

Federal: Yes

State : Yes

Local : No

The scheduled dates shown are approximations only. For more detailed information, please utilize the "Contact Us" information provided.

Location

This project is located in the HUDSON VALLEY region and includes the following:

Counties
WESTCHESTER

Cities
WHITE PLAINS

Towns
HARRISON
RYE
SCARSDALE

Villages
HARRISON
RYE BROOK
SCARSDALE

08 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
16th Congressional District (George Latimer)

State Senatorial District(s)
37th Senatorial District (Shelley B. Mayer)

State Assembly District(s)
088th Assembly District (Amy Paulin)
091th Assembly District (Steven Otis)
093th Assembly District (Chris Burdick)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Region 8 Regional Director's Office
4 Burnett Boulevard
Poughkeepsie, NY 12603
Phone: 845-431-5750
Email: dot.sm.r08.nysdot@dot.ny.gov
Provide feedback on this project