ROUTE 9 OVER STOCKPORT CREEK BRIDGE PROJECT: COLUMBIA COUNTY
Project ID No. 881592
Description
This project will rehabilitate or replace the bridge carrying Route 9 over Stockport Creek in the Town of Stockport, Columbia County. The bridge will be evaluated for rehabilitation versus replacement during the Preliminary Engineering phase.
Project Overview
Project Status
- The current status of the project is In Development.
- The Bid Opening is expected to be in Fall 2028.
- Construction is expected to begin in Winter 2028/2029.
- Construction is expected to be completed in Spring 2030.
Cost of the Project
The project cost is approximately $40,000,000 .
This project receives funding from the following sources:
Federal: Yes
State : Yes
Local : No
The scheduled dates shown are approximations only. For more detailed information, please utilize the "Contact Us" information provided.
Location
This project is located in the HUDSON VALLEY region and includes the following:
Counties
COLUMBIA
Towns
STOCKPORT
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
19th Congressional District (Josh Riley)
State Senatorial District(s)
41th Senatorial District (Michelle Hinchey)
State Assembly District(s)
107th Assembly District (Scott Bendett)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us:
4 Burnett Boulevard
Poughkeepsie, NY 12603
Phone: 845-431-5750
Email: dot.sm.r08.nysdot@dot.ny.gov