CULVERT IMPROVEMENTS: ULSTER COUNTY
Project ID No. 881584
Description
This project will replace three culverts and rehabilitate two culverts in Ulster County. The replacements will occur on two culverts that carry US Route 44 over Twaalfskill Creek and Unknown Stream in the Towns of Plattekill and Lloyd, and one culvert that carries US Route 209 over Unknown Stream in the Town of Marbletown. Some of these large culverts may be replaced with bridge-sized structures. The rehabilitations will occur on the culverts that carry NY Route 213 over Unknown Stream in the Town of Esopus and US Route 44 over Unknown Stream in the Town of Rochester.
Project Overview
Project Status
- The current status of the project is In Development.
- The Bid Opening is expected to be in Winter 2026/2027.
- Construction is expected to begin in Spring 2027.
- Construction is expected to be completed in Spring 2028.
Cost of the Project
The project cost is approximately $7,500,000 .
This project receives funding from the following sources:
Federal: Yes
State : Yes
Local : No
The scheduled dates shown are approximations only. For more detailed information, please utilize the "Contact Us" information provided.
Location
This project is located in the HUDSON VALLEY region and includes the following:
Counties
ULSTER
Towns
ESOPUS
LLOYD
MARBLETOWN
PLATTEKILL
ROCHESTER
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
18th Congressional District (Patrick Ryan)
19th Congressional District (Josh Riley)
State Senatorial District(s)
41th Senatorial District (Michelle Hinchey)
51th Senatorial District (Peter Oberacker)
State Assembly District(s)
101th Assembly District (Brian Maher)
103th Assembly District (Sarahana Shrestha)
104th Assembly District (Jonathan G. Jacobson)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us:
4 Burnett Boulevard
Poughkeepsie, NY 12603
Phone: 845-431-5750
Email: dot.sm.r08.nysdot@dot.ny.gov