SIGNAL REPLACEMENTS: DUTCHESS COUNTY
Project ID No. 881572
Description
This project will consist of replacing or installing new traffic control devices at intersections in Dutchess County. The work will include, but won't be limited to, replacing signals, installing flashing beacons and adding pedestrian signals and crosswalks at the intersections of Route 9D at Verplanck Ave in the City of Beacon, Route 44 at Route 82/Route 343 in the Town of Washington and Village of Millbrook, Eastbound Arterial (Route 44) at Fairmont Ave in the Town of Poughkeepsie, Route 22 @ Quaker Ave in the Town and Village of Pawling, and Route 115 at West Road in the Town of Pleasant Valley.
Project Overview
Location
This project is located in the HUDSON VALLEY region and includes the following:
Counties
DUTCHESS
Cities
BEACON
Towns
PAWLING
PLEASANT VALLEY
POUGHKEEPSIE
WASHINGTON
Villages
MILLBROOK
PAWLING
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
17th Congressional District (Michael Lawler)
18th Congressional District (Patrick Ryan)
State Senatorial District(s)
39th Senatorial District (Rob Rolison)
41th Senatorial District (Michelle Hinchey)
State Assembly District(s)
104th Assembly District (Jonathan G. Jacobson)
105th Assembly District (Anil Beephan, Jr.)
106th Assembly District (Didi Barrett)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us:
4 Burnett Boulevard
Poughkeepsie, NY 12603
Phone: 845-431-5750
Email: dot.sm.r08.nysdot@dot.ny.gov