RESURFACING ROUTES 9, 22, 120 & 433 IN WESTCHESTER COUNTY

Project ID No. 881541 , Contract Number D264425

Description

This project will address pavement deficiencies that exist on segments of four highways: Route 9, Route 22, Route 433, and Route 120 in Westchester County. The limits on Route 9 are from State Route 119 in the Village of Tarrytown in the Town of Greenburgh to College Avenue in the Village of Sleepy Hollow in the Town of Mount Pleasant. Route 433 will be repaved from the Connecticut state line to Route 22 in the Town of North Castle. State Route 22 will also be repaved from Route 120 to Middle Patent Road in the Town of North Castle. This project will also repave segments of Route 120: from Lake Street in the Village of Harrison to the Greenwich American Centre in the Town of North Castle and another segment from Westchester Avenue to Westerleigh Road in the Village of Harrison. The work will primarily consist of resurfacing to extend each route's service life and improve the quality and safety of the pavement.

Project Overview

Project Status

  • The project has been Completed Project.
  • The Bid Opening was on 02/04/2021

Project Schedule

Award of Contract Original Contract Completion Date* Substantially Completed Construction Schedule Variance from Contract Award**
03/05/2021 11/23/2021 08/25/2022 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$15,726,570 N/A N/A Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the HUDSON VALLEY region and includes the following:

Counties
WESTCHESTER

Towns
GREENBURGH
HARRISON
MOUNT PLEASANT
NORTH CASTLE

Villages
HARRISON
SLEEPY HOLLOW
TARRYTOWN

08 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
16th Congressional District (George Latimer)
17th Congressional District (Michael Lawler)

State Senatorial District(s)
35th Senatorial District (Andrea Stewart-Cousins)
37th Senatorial District (Shelley B. Mayer)

State Assembly District(s)
092th Assembly District (MaryJane Shimsky)
093th Assembly District (Chris Burdick)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Region 8 Regional Director's Office
4 Burnett Boulevard
Poughkeepsie, NY 12603
Phone: 845-431-5750
Email: dot.sm.r08.nysdot@dot.ny.gov
Provide feedback on this project