Project Details

HWP RESURFACING SEGMENTS OF ROUTES 202 AND 306: ROCKLAND COUNTY

Project ID No. 881523 , Contract Number D264256

Description

This project will correct pavement deficiencies that exist on segments of State Routes 202 and 306 in Rockland County. The portion of Route 306 that will be addressed includes between Route 59 and Viola Road in the Town in the Town Ramapo and the Villages of Kaser and New Hempstead. The limits of the eastern segment of the project on Route 202 in the Town of Haverstraw are from Mead Drive in the Village of West Haverstraw to State Route 9W including Reference Route 981F (Westside Avenue) in the Village of Haverstraw. The limits of the western segment of Route 202 are from the intersection of the southbound exit ramp of the Palisades Interstate Parkway to just west of Route 306. This project will improve the quality and safety of the pavement and will construct sidewalk curb ramps to current Americans with Disabilities Act specifications as necessary. The project will also repair or replace traffic signal loops as necessary.

Project Overview

Project Status

  • The project has been Completed Project.
  • The Bid Opening was on 05/21/2020

Project Schedule

Award of Contract Original Contract Completion Date* Substantially Completed Construction Schedule Variance from Contract Award**
07/16/2020 10/31/2020 11/24/2020 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$3,270,624 N/A N/A Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: No

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the HUDSON VALLEY region and includes the following:

Counties
ROCKLAND

Towns
HAVERSTRAW
RAMAPO

Villages
HAVERSTRAW
KASER
POMONA
WEST HAVERSTRAW

08 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
17th Congressional District (Michael Lawler)

State Senatorial District(s)
38th Senatorial District (Bill Weber)

State Assembly District(s)
096th Assembly District (Patrick J. Carroll)
097th Assembly District (Aron Wieder)
098th Assembly District (Karl Brabenec)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Region 8 Regional Director's Office
4 Burnett Boulevard
Poughkeepsie, NY 12603
Phone: 845-431-5750
Email: dot.sm.r08.nysdot@dot.ny.gov
Provide feedback on this project