Project Details

CULVERT JOC: ROCKLAND AND WESTCHESTER

Project ID No. 881447 , Contract Number D265409

Description

This project will consist of making repairs and performing other maintenance-related activities, as needed, to preserve the safety and integrity of culverts under the care of the New York State Department of Transportation. The work will take place in various municipalities throughout Rockland and Westchester counties.

Project Overview

Project Status

  • The project has been Under Construction.
  • The Bid Opening was on 03/13/2025

Project Schedule

Award of Contract Original Contract Completion Date* Estimated Substantial Completion Date* Construction Schedule Variance from Contract Award**
06/03/2025 04/27/2026 06/03/2027 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$2,025,000 $2,025,000 $4,050,000 Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: No

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the HUDSON VALLEY region and includes the following:

Counties
ROCKLAND
WESTCHESTER

08 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
16th Congressional District (George Latimer)
17th Congressional District (Michael Lawler)

State Senatorial District(s)
34th Senatorial District (Nathalia Fernandez)
35th Senatorial District (Andrea Stewart-Cousins)
36th Senatorial District (Jamaal T. Bailey)
37th Senatorial District (Shelley B. Mayer)
38th Senatorial District (Bill Weber)
40th Senatorial District (Pete Harckham)

State Assembly District(s)
088th Assembly District (Amy Paulin)
089th Assembly District (J. Gary Pretlow)
090th Assembly District (Nader J. Sayegh)
091th Assembly District (Steven Otis)
092th Assembly District (MaryJane Shimsky)
093th Assembly District (Chris Burdick)
094th Assembly District (Matt Slater)
095th Assembly District (Dana Levenberg)
096th Assembly District (Patrick J. Carroll)
097th Assembly District (Aron Wieder)
098th Assembly District (Karl Brabenec)
099th Assembly District (Chris Eachus)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Region 8 Regional Director's Office
4 Burnett Boulevard
Poughkeepsie, NY 12603
Phone: 845-431-5750
Email: dot.sm.r08.nysdot@dot.ny.gov
Provide feedback on this project