Project Details

CATCH BASINS: TSP WESTCHESTER CO

Project ID No. 881428 , Contract Number D264967

Description

This project will repair or replace storm water catch basins along the Taconic State Parkway to ensure that the drainage system functions as originally designed. The work will take place in the Towns of Mount Pleasant, New Castle, North Castle and Yorktown, and the Village of Briarcliff Manor in Westchester County.

Project Overview

Project Status

  • The project has been Completed Project.
  • The Bid Opening was on 01/19/2023

Project Schedule

Award of Contract Original Contract Completion Date* Substantially Completed Construction Schedule Variance from Contract Award**
02/17/2023 04/03/2024 11/14/2023 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$1,879,068 N/A N/A Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the HUDSON VALLEY region and includes the following:

Counties
WESTCHESTER

Towns
MOUNT PLEASANT
NEW CASTLE
NORTH CASTLE
YORKTOWN

Villages
BRIARCLIFF MANOR

08 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
17th Congressional District (Michael Lawler)

State Senatorial District(s)
35th Senatorial District (Andrea Stewart-Cousins)
37th Senatorial District (Shelley B. Mayer)
40th Senatorial District (Pete Harckham)

State Assembly District(s)
092th Assembly District (MaryJane Shimsky)
093th Assembly District (Chris Burdick)
094th Assembly District (Matt Slater)
095th Assembly District (Dana Levenberg)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Region 8 Regional Director's Office
4 Burnett Boulevard
Poughkeepsie, NY 12603
Phone: 845-431-5750
Email: dot.sm.r08.nysdot@dot.ny.gov
Provide feedback on this project