Project Details

BRIDGE REHAB: TSP, ROUTES 52 & 304 - ORANGE, ROCK & WEST CO

Project ID No. 881370 , Contract Number D265160

Description

This project will undertake corrective and preventative maintenance actions to extend the service life of 3 bridges on state highways in Rockland, Orange, and Westchester Counties. This project will rehabilitate the following three structures that carry NY Route 52 over Interstate 84 in the Town of Newburgh in Orange County, NY Route 304 over 87IX in the Town of Clarkstown in Rockland County, and Illington Road over the Taconic State Parkway (987G) in the Town of Yorktown in Westchester County.

Project Overview

Project Status

  • The project has been Under Construction.
  • The Bid Opening was on 03/14/2024

Project Schedule

Award of Contract Original Contract Completion Date* Estimated Substantial Completion Date* Construction Schedule Variance from Contract Award**
04/22/2024 06/30/2026 09/17/2028 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$17,367,539 $5,066,910 $22,434,449 Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the HUDSON VALLEY region and includes the following:

Counties
ORANGE
ROCKLAND
WESTCHESTER

Towns
CLARKSTOWN
NEWBURGH
YORKTOWN

08 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
17th Congressional District (Michael Lawler)
18th Congressional District (Patrick Ryan)

State Senatorial District(s)
38th Senatorial District (Bill Weber)
39th Senatorial District (Rob Rolison)
40th Senatorial District (Pete Harckham)

State Assembly District(s)
095th Assembly District (Dana Levenberg)
096th Assembly District (Patrick J. Carroll)
104th Assembly District (Jonathan G. Jacobson)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Region 8 Regional Director's Office
4 Burnett Boulevard
Poughkeepsie, NY 12603
Phone: 845-431-5750
Email: dot.sm.r08.nysdot@dot.ny.gov
Provide feedback on this project