Project Details

TN OF E FISHKILL ROUTES 82/376 INTERSECTION IMPROVEMENTS

Project ID No. 876286

Description

This project will complete intersection improvements in the Hamlet of Hopewell Junction in the Town of East Fishkill in Dutchess County. A roundabout will be constructed at the Route 82 and Route 376 South intersection and pedestrian and traffic flow improvements will be made to the existing signalized intersection at Route 82 and 376 North. The work will include pedestrian facility improvements such as sidewalks and crossings. The project would reduce traffic congestion, improve air quality, improve operation and safety and support economic revitalization in the Hamlet of Hopewell Junction.

Project Overview

Location

This project is located in the HUDSON VALLEY region and includes the following:

Counties
DUTCHESS

Towns
EAST FISHKILL

08 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
17th Congressional District (Michael Lawler)

State Senatorial District(s)
39th Senatorial District (Rob Rolison)

State Assembly District(s)
105th Assembly District (Anil Beephan, Jr.)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Region 8 Regional Director's Office
4 Burnett Boulevard
Poughkeepsie, NY 12603
Phone: 845-431-5750
Email: dot.sm.r08.nysdot@dot.ny.gov
Provide feedback on this project