WALLKILL HAMLET SIDEWALKS
Project ID No. 875995
Description
This project will improve 1.9 miles of sidewalk in the hamlet of Wallkill, Town of Shawangunk, Ulster County. New concrete sidewalk will be installed as follows: north side of Bridge Street from Wallkill Avenue to Park Avenue and on the south side to Church Street, north side of Main Street from Wallkill Avenue to Railroad Avenue and on the south side to Central Avenue, north and south sides of Church Street from Wallkill Avenue to Bridge Street, and the northwesterly side of Central Avenue from State Route 208 to Bridge Street. This project will result in sidewalks, ramps, and crosswalks that are in compliance with the American Disabilities Act.
Project Overview
Project Status
- The project has been Completed Project.
- The Bid Opening was on 01/24/2017
Project Schedule
| Award of Contract | Original Contract Completion Date* | Substantially Completed | Construction Schedule Variance from Contract Award** |
|---|---|---|---|
| 05/26/2017 | N/A | N/A |
|
**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
| Contract Award Cost | Approved Cost Changes | Current Construction Contract Cost | Cost Variance of Construction Contract** |
|---|---|---|---|
| N/A | N/A | N/A |
|
**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost
This project receives funding from the following sources:
Federal: Yes
State: Yes
Local: Yes
*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
Location
This project is located in the HUDSON VALLEY region and includes the following:
Counties
ULSTER
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
19th Congressional District (Josh Riley)
State Senatorial District(s)
42th Senatorial District (James Skoufis)
State Assembly District(s)
101th Assembly District (Brian Maher)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us:
4 Burnett Boulevard
Poughkeepsie, NY 12603
Phone: 845-431-5750
Email: dot.sm.r08.nysdot@dot.ny.gov