ROUTE 17M PAVING: ROUTE 94 TO VILLAGE OF MONROE LINE
Project ID No. 856433 , Contract Number D265004
Description
The project will repave State Route 17M from State Route 94 to the Village/Town of Monroe line in the Village of Chester, Town of Chester, Town of Blooming Grove, and Town of Monroe in Orange County. The work will primarily consist of milling the existing pavement and resurfacing the roadway with a warm-mix asphalt overlay to the road surface to extend its service life and improve the quality and safety of the pavement. Work will also include reconstructing curb ramps, where present, to be made compliant with current ADA guidelines. Additionally, general drainage improvements will be made where practicable within the scope of this maintenance paving project.
Project Overview
Project Status
- The project has been Completed Project.
- The Bid Opening was on 04/06/2023
Project Schedule
| Award of Contract | Original Contract Completion Date* | Substantially Completed | Construction Schedule Variance from Contract Award** |
|---|---|---|---|
| 06/01/2023 | 09/30/2023 | 11/15/2023 |
|
**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
| Contract Award Cost | Approved Cost Changes | Current Construction Contract Cost | Cost Variance of Construction Contract** |
|---|---|---|---|
| $5,750,750 | N/A | N/A |
|
**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost
This project receives funding from the following sources:
Federal: No
State: Yes
Local: No
*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
Location
This project is located in the HUDSON VALLEY region and includes the following:
Counties
ORANGE
Towns
BLOOMING GROVE
CHESTER
MONROE
Villages
CHESTER
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
18th Congressional District (Patrick Ryan)
State Senatorial District(s)
42th Senatorial District (James Skoufis)
State Assembly District(s)
098th Assembly District (Karl Brabenec)
099th Assembly District (Chris Eachus)
101th Assembly District (Brian Maher)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us:
4 Burnett Boulevard
Poughkeepsie, NY 12603
Phone: 845-431-5750
Email: dot.sm.r08.nysdot@dot.ny.gov