Project Details

ROUTE 9W BRIDGE REPLACEMENTS AND REHABILITATIONS

Project ID No. 823945 , Contract Number D263935

Description

This project will either replace the structures or provide maintenance work to correct or prevent problems related to the deterioration of a variety of bridge components for a number of structures located along State Route 9W in Orange County. Structures will include, Blooming Grove TP over Route 9W in the Town of New Windsor, and Willow Ave (CR 32) over Route 9W, Route 9W over Quaker Ave (CR 107) and Angola Rd (CR 9) over Route 9W located in the Town of Cornwall. The highway approaches to these bridges and the roadway underneath will be designed for reconstruction as part of the bridge replacement.

Project Overview

Project Status

  • The project has been Completed Project.
  • The Bid Opening was on 04/11/2019

Project Schedule

Award of Contract Original Contract Completion Date* Substantially Completed Construction Schedule Variance from Contract Award**
06/03/2019 11/27/2021 10/28/2021 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$23,600,000 N/A N/A Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the HUDSON VALLEY region and includes the following:

Counties
ORANGE

Towns
CORNWALL
HIGHLANDS
NEW WINDSOR

08 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
18th Congressional District (Patrick Ryan)

State Senatorial District(s)
42th Senatorial District (James Skoufis)

State Assembly District(s)
099th Assembly District (Chris Eachus)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Region 8 Regional Director's Office
4 Burnett Boulevard
Poughkeepsie, NY 12603
Phone: 845-431-5750
Email: dot.sm.r08.nysdot@dot.ny.gov
Provide feedback on this project