Project Details

RESURFACING: SEGMENTS OF ROUTE 22, COLUMBIA COUNTY

Project ID No. 813134 , Contract Number D265717

Description

This project will correct existing pavement deficiencies on two segments of State Route 22 from Route 23 to North of County Route 21 in the Town of Hillsdale and Route 20 to the Rensselaer Line in the Town of New Lebanon in Columbia County. The work will primarily consist of milling the existing pavement and resurfacing the roadway with a warm mix asphalt overlay to the road surface to extend its service life and improve the quality and safety of the pavement.

Project Overview

Project Status

  • The project has been Under Construction.
  • The Bid Opening was on 02/26/2026

Project Schedule

Award of Contract Original Contract Completion Date* Estimated Substantial Completion Date* Construction Schedule Variance from Contract Award**
03/24/2026 12/31/2026 11/30/2026 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$4,493,204 $0 $4,493,204 Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the HUDSON VALLEY region and includes the following:

Counties
COLUMBIA
RENSSELAER

Towns
HILLSDALE
NEW LEBANON
STEPHENTOWN

08 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
19th Congressional District (Josh Riley)

State Senatorial District(s)
41th Senatorial District (Michelle Hinchey)
43th Senatorial District (Jacob Ashby)

State Assembly District(s)
106th Assembly District (Didi Barrett)
107th Assembly District (Scott Bendett)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Region 8 Regional Director's Office
4 Burnett Boulevard
Poughkeepsie, NY 12603
Phone: 845-431-5750
Email: dot.sm.r08.nysdot@dot.ny.gov
Provide feedback on this project