ROUTE 212 WOODSTOCK MAIN STREET BRIDGE AND SIDEWALK IMPROVEMENTS: T/O WOODSTOCK
Project ID No. 812220
Description
This project will improve pedestrian access along State Route 212 (Main Street) and rehabilitate or replace up to four structures that carry Route 212 over the Tannery Brook in the Town of Woodstock in Ulster County. The treatment type for each structure will be identified during the design phase.
Project Overview
Project Status
- The current status of the project is In Development.
- The Bid Opening is expected to be in Spring 2028.
- Construction is expected to begin in Spring 2028.
- Construction is expected to be completed in Summer 2029.
Cost of the Project
The project cost is approximately $25,000,000 .
This project receives funding from the following sources:
Federal: Yes
State : Yes
Local : No
The scheduled dates shown are approximations only. For more detailed information, please utilize the "Contact Us" information provided.
Location
This project is located in the HUDSON VALLEY region and includes the following:
Counties
ULSTER
Towns
WOODSTOCK
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
19th Congressional District (Josh Riley)
State Senatorial District(s)
41th Senatorial District (Michelle Hinchey)
State Assembly District(s)
103th Assembly District (Sarahana Shrestha)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us:
4 Burnett Boulevard
Poughkeepsie, NY 12603
Phone: 845-431-5750
Email: dot.sm.r08.nysdot@dot.ny.gov