I-287/CWE EB TO SMRP NB MSES WALL REPAIR
Project ID No. 810632 , Contract Number D264593
Description
In order to address the deficiencies of the Mechanically Stabilized Earth System (MSES) wall ramp, this project will replace the existing ramp that carries Interstate 287 (Cross Westchester Expressway) eastbound to the Saw Mill River Parkway northbound, minimizing required retaining wall systems and eliminating the use of MSE construction methods by incorporating horizontal realignment, new embankment sections, and the appropriate types of retaining walls where needed. In addition to the proposed retaining walls that will reinforce the existing MSE walls that support the ramp, an additional wall will be constructed in front of the existing bridge abutment and will connect the proposed walls on both sides of the new ramp. The new retaining walls at the beginning of the proposed full depth reconstruction would reinforce the existing bridge abutment at the end of BIN 1070490 and the existing MSE walls that are to be left in place. This will reduce traffic impacts during construction, eliminate significant excavation and fill costs, and save time during construction. This project is located in the Town of Greenburgh in Westchester County.
Project Overview
Project Status
- The project has been Under Construction.
- The Bid Opening was on 12/16/2021
Project Schedule
| Award of Contract | Original Contract Completion Date* | Estimated Substantial Completion Date* | Construction Schedule Variance from Contract Award** |
|---|---|---|---|
| 02/14/2022 | 11/23/2022 | N/A |
|
**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
| Contract Award Cost | Approved Cost Changes | Current Construction Contract Cost | Cost Variance of Construction Contract** |
|---|---|---|---|
| $8,482,616 | $7,006,913 | $15,489,529 |
|
**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost
This project receives funding from the following sources:
Federal: Yes
State: Yes
Local: No
*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
Location
This project is located in the HUDSON VALLEY region and includes the following:
Counties
WESTCHESTER
Towns
GREENBURGH
Villages
ELMSFORD
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
16th Congressional District (George Latimer)
State Senatorial District(s)
35th Senatorial District (Andrea Stewart-Cousins)
State Assembly District(s)
092th Assembly District (MaryJane Shimsky)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us:
4 Burnett Boulevard
Poughkeepsie, NY 12603
Phone: 845-431-5750
Email: dot.sm.r08.nysdot@dot.ny.gov