This project will install Intelligent Transportation System equipment along Interstate 84 from the Pennsylvania State line to the Connecticut State line in Dutchess, Orange and Putnam Counties. Variable message signs and/or other communications methods will be used to inform drivers of traffic conditions. The equipment will be linked to the Hudson Valley Transportation Management Center in Hawthorne. Additionally Queue Detectors will be installed on the Sprain Brook Parkway and Interstate 684 in Westchester County and be linked through the Center in Hawthorne to Variable Message Signs along the primary routes.

Project Overview

Project Status

  • The project has been Completed Project.
  • The Bid Opening was on 07/12/2018

Project Schedule

Award of Contract Original Contract Completion Date* Substantially Completed Construction Schedule Variance from Contract Award**
08/17/2018 12/31/2019 06/25/2020 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$16,805,007 N/A N/A Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the HUDSON VALLEY region and includes the following:

Counties
DUTCHESS
ORANGE
PUTNAM
WESTCHESTER

Cities
BEACON
NEWBURGH
PORT JERVIS

Towns
DEERPARK
EAST FISHKILL
FISHKILL
GREENBURGH
GREENVILLE
MONTGOMERY
MOUNT PLEASANT
NEWBURGH
NORTH SALEM
PATTERSON
SOUTHEAST
WALLKILL
WAWAYANDA
KENT

Villages
ELMSFORD

08 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
16th Congressional District (George Latimer)
17th Congressional District (Michael Lawler)
18th Congressional District (Patrick Ryan)

State Senatorial District(s)
35th Senatorial District (Andrea Stewart-Cousins)
39th Senatorial District (Rob Rolison)
40th Senatorial District (Pete Harckham)
42th Senatorial District (James Skoufis)

State Assembly District(s)
092th Assembly District (MaryJane Shimsky)
093th Assembly District (Chris Burdick)
094th Assembly District (Matt Slater)
098th Assembly District (Karl Brabenec)
099th Assembly District (Chris Eachus)
100th Assembly District (Paula Elaine Kay)
101th Assembly District (Brian Maher)
104th Assembly District (Jonathan G. Jacobson)
105th Assembly District (Anil Beephan, Jr.)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Region 8 Regional Director's Office
4 Burnett Boulevard
Poughkeepsie, NY 12603
Phone: 845-431-5750
Email: dot.sm.r08.nysdot@dot.ny.gov
Provide feedback on this project