ROUTE 128 REPAVING: ROUTE 22 TO SCHOOL STREET

Project ID No. 803403 , Contract Number D265100

Description

The pavement surface of this segment of Route 128 shows alligator cracking, heaving, and a rough riding surface. The proposed treatment will correct pavement wear by milling off the existing pavement to a depth of 1.5 inches and filling with the same depth of top course asphalt overlay. In addition to pavement repairs, drainage basins will be repaired and reset to proper height as needed. Curb ramps, where present, will be assessed and if needed brought up to current Americans with Disability Act standards. In locations of traffic signals, traffic signal inductance loops damaged by milling will be replaced as required. New pavement markings will be installed as needed.  This project is taking place in the Town of North Castle in Westchester County.

Project Overview

Project Status

  • The project has been Completed Project.
  • The Bid Opening was on 10/26/2023

Project Schedule

Award of Contract Original Contract Completion Date* Substantially Completed Construction Schedule Variance from Contract Award**
03/25/2024 11/01/2024 10/29/2024 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$2,491,878 N/A N/A Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: No

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the HUDSON VALLEY region and includes the following:

Counties
WESTCHESTER

Towns
NORTH CASTLE

08 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
17th Congressional District (Michael Lawler)

State Senatorial District(s)
37th Senatorial District (Shelley B. Mayer)

State Assembly District(s)
093th Assembly District (Chris Burdick)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Region 8 Regional Director's Office
4 Burnett Boulevard
Poughkeepsie, NY 12603
Phone: 845-431-5750
Email: dot.sm.r08.nysdot@dot.ny.gov
Provide feedback on this project