Project Details

ROUTE 119 AT ROUTE 100B INTERSECTION PROJECT: T/O GREENBURGH

Project ID No. 802018

Description

This construction project will make intersection enhancements to Route 119 at Route 100B. Crashes in the project area are related to traffic volume/congestion along Route 119. The existing left turn lane from Route 119 to Route 100B is shared with the through movement. Possible enhancements may include reconfiguring lane width and potentially eliminating on street parking along Route 119 to add a dedicated left turn lane from Route 100 to Route 100B, add pedestrian accommodations including: crosswalks, sidewalk and curb ramps, and additional intersection enhancements. The project will also explore opportunities for enhancements at the adjacent intersection of  Route 119 at Route 100.

Project Overview

Project Status

  • The current status of the project is In Development.
  • The Bid Opening is expected to be in Summer 2028.
  • Construction is expected to begin in Fall 2028.
  • Construction is expected to be completed in Winter 2028/2029.

Cost of the Project

The project cost is approximately $3,500,000 .

This project receives funding from the following sources:

Federal: Yes

State : Yes

Local : No

The scheduled dates shown are approximations only. For more detailed information, please utilize the "Contact Us" information provided.

Location

This project is located in the HUDSON VALLEY region and includes the following:

Counties
WESTCHESTER

Towns
GREENBURGH

08 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
16th Congressional District (George Latimer)

State Senatorial District(s)
35th Senatorial District (Andrea Stewart-Cousins)

State Assembly District(s)
092th Assembly District (MaryJane Shimsky)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Region 8 Regional Director's Office
4 Burnett Boulevard
Poughkeepsie, NY 12603
Phone: 845-431-5750
Email: dot.sm.r08.nysdot@dot.ny.gov
Provide feedback on this project