SPACKENKILL ROAD OVER ROUTE 9 BRIDGE: TOWN OF POUGHKEEPSIE
Project ID No. 800703
Description
This project will replace the bridge carrying Spackenkill Road over Route 9 in the Town of Poughkeepsie, Dutchess County. Operational improvements may be considered as a part of scoping.
Project Overview
Project Status
- The current status of the project is In Development.
- The Bid Opening is expected to be in Summer 2029.
- Construction is expected to begin in Summer 2029.
- Construction is expected to be completed in Winter 2031/2032.
Cost of the Project
The project cost is approximately $15,000,000 .
This project receives funding from the following sources:
Federal: Yes
State : Yes
Local : No
The scheduled dates shown are approximations only. For more detailed information, please utilize the "Contact Us" information provided.
Location
This project is located in the HUDSON VALLEY region and includes the following:
Counties
DUTCHESS
Towns
POUGHKEEPSIE
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
18th Congressional District (Patrick Ryan)
State Senatorial District(s)
39th Senatorial District (Rob Rolison)
State Assembly District(s)
106th Assembly District (Didi Barrett)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us:
4 Burnett Boulevard
Poughkeepsie, NY 12603
Phone: 845-431-5750
Email: dot.sm.r08.nysdot@dot.ny.gov