ROUTE 17 @ ROUTE 32 (EXIT 131) INTERCHANGE RECONSTRUCTION

Project ID No. 800684 , Contract Number D900038

Description

This project will modernize the antiquated infrastructure along segments of Route 17, Route 32 and Exits 130A and Exit 131. This project will reconstruct a three mile segment of Route 17 to interstate standards, will modernize the interchanges at Exit 130A, Route 6 and Exit 131 Route 32, will reconstruct a one mile stretch of Route 32 replacing all signs and guide rails to improve operations and safety as well will replace the bridge on Route 17 at Route 32. As well this project will add additional lanes and advanced electronic guide signs along Route 17 at the plaza with Interstate 87 and will rehabilitate the Route 6 Bridge over Forrest Road Look Out to meet clearance standards. This project is located in the Towns of Monroe and Woodbury in Orange County.

Project Overview

Project Status

  • The project has been Under Construction.
  • The Bid Opening was on 09/11/2017

Project Schedule

Award of Contract Original Contract Completion Date* Estimated Substantial Completion Date* Construction Schedule Variance from Contract Award**
11/28/2017 10/24/2019 N/A Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$134,111,000 $6,347,619 $140,458,619 Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the HUDSON VALLEY region and includes the following:

Counties
ORANGE

Towns
MONROE
WOODBURY

Villages
HARRIMAN
WOODBURY

08 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
18th Congressional District (Patrick Ryan)

State Senatorial District(s)
42th Senatorial District (James Skoufis)

State Assembly District(s)
099th Assembly District (Chris Eachus)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Region 8 Regional Director's Office
4 Burnett Boulevard
Poughkeepsie, NY 12603
Phone: 845-431-5750
Email: dot.sm.r08.nysdot@dot.ny.gov
Provide feedback on this project