ROUTES 94 & 17A PAVING IMPROVEMENTS: WARWICK AND GOSHEN
Project ID No. 800224 , Contract Number D265402
Description
The existing pavement on Route 17A/94 from NJ State Line to the Town of Goshen line and on Route 94 from the Rt 17A overlap to Durland Road in the Towns of Goshen and Warwick and the Villages of Goshen, Warwick and Florida, Orange County, shows signs of wear and tear deterioration including longitudinal and lateral pavement cracking. Additional resurfacing will be included in the project along Route 17A from Route 94/17A to Long House Creek. Pedestrian facilities along Route 17A/94 are in need of improvements to assure compliance with the Americans with Disabilities Act. This project also includes replacing the culverts carrying Route 94 over Browns Creek and Route 17A over Unknown Stream as well as two small reinforced concrete pipes on Route 94. Pavement slope repair is necessary in some locations along Route 94 from the Route 17A overlap to Durland Road. Intersection improvements will be made at the intersections of Route 94 at Colonial Avenue, Meadow Road, and Reservoir Road.
Project Overview
Project Status
- The project has been Under Construction.
- The Bid Opening was on 02/20/2025
Project Schedule
| Award of Contract | Original Contract Completion Date* | Estimated Substantial Completion Date* | Construction Schedule Variance from Contract Award** |
|---|---|---|---|
| 04/18/2025 | 07/30/2027 | 07/01/2027 |
|
**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
| Contract Award Cost | Approved Cost Changes | Current Construction Contract Cost | Cost Variance of Construction Contract** |
|---|---|---|---|
| $30,322,380 | $5,038,223 | $35,360,603 |
|
**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost
This project receives funding from the following sources:
Federal: Yes
State: Yes
Local: No
*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
Location
This project is located in the HUDSON VALLEY region and includes the following:
Counties
ORANGE
Towns
GOSHEN
WARWICK
Villages
FLORIDA
GOSHEN
WARWICK
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
18th Congressional District (Patrick Ryan)
State Senatorial District(s)
42th Senatorial District (James Skoufis)
State Assembly District(s)
098th Assembly District (Karl Brabenec)
101th Assembly District (Brian Maher)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us:
4 Burnett Boulevard
Poughkeepsie, NY 12603
Phone: 845-431-5750
Email: dot.sm.r08.nysdot@dot.ny.gov