PAVING: ROUTE 9G - CITY OF POUGHKEEPSIE LINE TO SOUTH CROSS ROAD, DUTCHESS COUNTY
Project ID No. 800153
Description
This project will correct existing pavement deficiencies on State Route 9G from the City of Poughkeepsie Line to South Cross Road in the Towns of Poughkeepsie and Hyde Park in Dutchess County. The work will primarily consist of milling and filling the roadway and resurfacing with warm-mix asphalt to extend its service life and improve the quality and safety of the pavement.
Project Overview
Project Status
- The current status of the project is In Development.
- The Bid Opening is expected to be in Winter 2026/2027.
- Construction is expected to begin in Winter 2026/2027.
- Construction is expected to be completed in Winter 2027/2028.
Cost of the Project
The project cost is approximately $8,500,000 .
This project receives funding from the following sources:
Federal: No
State : Yes
Local : No
The scheduled dates shown are approximations only. For more detailed information, please utilize the "Contact Us" information provided.
Location
This project is located in the HUDSON VALLEY region and includes the following:
Counties
DUTCHESS
Towns
HYDE PARK
POUGHKEEPSIE
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
18th Congressional District (Patrick Ryan)
State Senatorial District(s)
39th Senatorial District (Rob Rolison)
41th Senatorial District (Michelle Hinchey)
State Assembly District(s)
104th Assembly District (Jonathan G. Jacobson)
106th Assembly District (Didi Barrett)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us:
4 Burnett Boulevard
Poughkeepsie, NY 12603
Phone: 845-431-5750
Email: dot.sm.r08.nysdot@dot.ny.gov