US 11 SIGNAL OPTIMIZATION
Project ID No. 780825
Description
The project will install signal optimization/traffic flow improvement measures (such as, but not limited to advanced detection with a hybrid video/radar approach) along the US Rt 11 corridor between the NYS Rte. 342 intersection and the I-781 intersection. The projects benefits include real time congestion monitoring that intends to decrease delays, travel time, and congestion in both the main line and side streets to improve air quality.
Project Overview
Project Status
- The current status of the project is In Development.
- The Bid Opening is expected to be in Fall 2027.
- Construction is expected to begin in Fall 2027.
- Construction is expected to be completed in Summer 2028.
Cost of the Project
The project cost is approximately $430,000 .
This project receives funding from the following sources:
Federal: Yes
State : Yes
Local : No
The scheduled dates shown are approximations only. For more detailed information, please utilize the "Contact Us" information provided.
Location
This project is located in the NORTH COUNTRY region and includes the following:
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.