OVERHEAD SIGN STRUCTURES; SFY 26/27
Project ID No. 581492 , Contract Number D265793
Description
This project will replace signs that are damaged, have fallen down, have no reflectivity for nighttime visibility, and/or will correct safety/operational issues as needed at various locations in Cattaraugus, Erie & Niagara Counties.
Project Overview
Project Status
- The project has been Under Construction.
- The Bid Opening was on 06/04/2026
Project Schedule
| Award of Contract | Original Contract Completion Date* | Estimated Substantial Completion Date* | Construction Schedule Variance from Contract Award** |
|---|---|---|---|
| 07/06/2026 | 11/01/2027 | 11/01/2027 |
|
**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
| Contract Award Cost | Approved Cost Changes | Current Construction Contract Cost | Cost Variance of Construction Contract** |
|---|---|---|---|
| $1,254,756 | ($1) | $1,254,756 |
|
**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost
This project receives funding from the following sources:
Federal: Yes
State: Yes
Local: No
*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
Location
This project is located in the WESTERN NEW YORK region and includes the following:
Counties
CATTARAUGUS
ERIE
NIAGARA
Cities
BUFFALO
NORTH TONAWANDA
Towns
AMHERST
CONEWANGO
DAYTON
FARMERSVILLE
FRANKLINVILLE
ISCHUA
MACHIAS
PERSIA
RANDOLPH
TONAWANDA
WHEATFIELD
Villages
FRANKLINVILLE
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
23th Congressional District (Nicholas Langworthy)
26th Congressional District (Timothy Kennedy)
State Senatorial District(s)
57th Senatorial District (George M. Borrello)
61th Senatorial District (Jeremy J. Zellner)
62th Senatorial District (Robert G. Ortt)
State Assembly District(s)
140th Assembly District (William Conrad)
145th Assembly District (Angelo J. Morinello)
146th Assembly District (Karen McMahon)
148th Assembly District (Joe Sempolinski)
149th Assembly District (Jonathan Rivera)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us: