DRAINAGE SWEEPING; SFY 25/26; ERIE & NIAGARA COUNTY
Project ID No. 581474 , Contract Number D265626
Description
The objective of this project is to sweep the roadways to remove debris before the material is washed into the closed drainage system throughout various location throughout Erie & Niagara County..
Project Overview
Project Status
- The project has been Under Construction.
- The Bid Opening was on 11/20/2025
Project Schedule
| Award of Contract | Original Contract Completion Date* | Estimated Substantial Completion Date* | Construction Schedule Variance from Contract Award** |
|---|---|---|---|
| 01/02/2026 | 06/30/2027 | 05/31/2027 |
|
**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion
Construction Costs
| Contract Award Cost | Approved Cost Changes | Current Construction Contract Cost | Cost Variance of Construction Contract** |
|---|---|---|---|
| $705,792 | $0 | $705,792 |
|
**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost
This project receives funding from the following sources:
Federal: No
State: Yes
Local: No
*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.
Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.
Location
This project is located in the WESTERN NEW YORK region and includes the following:
Counties
ERIE
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
State Assembly District(s)
139th Assembly District (Stephen Hawley)
140th Assembly District (William Conrad)
141th Assembly District (Crystal D. Peoples-Stokes)
142th Assembly District (Patrick Burke)
143th Assembly District (Patrick J. Chludzinski)
144th Assembly District (Paul A. Bologna)
145th Assembly District (Angelo J. Morinello)
146th Assembly District (Karen McMahon)
147th Assembly District (David DiPietro)
149th Assembly District (Jonathan Rivera)
150th Assembly District (Andrew M. Molitor)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us: