US 62 (NIAGARA FALLS BLVD); MAVIS DR - SY RD
Project ID No. 530844
Description
Reconstruct and widen US Route 62 in order to provide a consistent pavement section throughout the corridor with standard shoulders, two travel lanes in each direction, and a two-way center left turn lane.
Project Overview
Project Status
- The current status of the project is In Development.
- The Bid Opening is expected to be in Spring 2027.
- Construction is expected to begin in Summer 2027.
- Construction is expected to be completed in Winter 2027/2028.
Cost of the Project
The project cost is approximately $17,000,000 .
This project receives funding from the following sources:
Federal: Yes
State : Yes
Local : No
The scheduled dates shown are approximations only. For more detailed information, please utilize the "Contact Us" information provided.
Location
This project is located in the WESTERN NEW YORK region and includes the following:
Counties
NIAGARA
Towns
WHEATFIELD
Legislative District:
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
26th Congressional District (Timothy Kennedy)
State Senatorial District(s)
62th Senatorial District (Robert G. Ortt)
State Assembly District(s)
145th Assembly District (Angelo J. Morinello)
Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.
Contact Us:
If you have questions about this project, please contact us: