Project Details

US 219; PHASE 2 & NY 954T; I-86 - NY 417

Project ID No. 510192 , Contract Number D264919

Description

This project will resurface the pavement on the southbound and northbound pavement on US Route 219 from 1 mile south of the Seneca Nation of Indians (SNI) Territory to I-86 and Route 954T from I-86 to NY Route 417 in the Town of Carrollton, Cattaraugus County. Guiderail replacements and drainage system repairs will be made as necessary. General bridge repairs will be made to the US Route 219 bridge over the Allegany River (BIN 6041450). Work to include deck, joint, bearing, steel beam ends, fascia, and substructure repairs.

Project Overview

Project Status

  • The project has been Completed Project.
  • The Bid Opening was on 12/15/2022

Project Schedule

Award of Contract Original Contract Completion Date* Substantially Completed Construction Schedule Variance from Contract Award**
01/09/2023 09/30/2024 08/31/2024 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$13,163,632 N/A N/A Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the WESTERN NEW YORK region and includes the following:

Counties
CATTARAUGUS

Towns
CARROLLTON

05 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
23th Congressional District (Nicholas Langworthy)

State Senatorial District(s)
57th Senatorial District (George M. Borrello)

State Assembly District(s)
148th Assembly District (Joe Sempolinski)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Ryan Whalen
100 Seneca Street
Buffalo, NY 14203
Phone: 716-847-3239
Email: ryan.whalen@dot.ny.gov
Provide feedback on this project