This project website contains information about all of the NYSDOT projects being undertaken on Buffalo's Outer Harbor. Taking its cues from the natural environment and ecosystem of Lake Erie and from the rich industrial heritage of Buffalo, the Outer Harbor Parkway Project celebrates that unique place where terra firma meets the shores of Lake Erie. This waterfront design recognizes the past while looking to the future. The project will be an asset to Buffalonians and to visitors for generations to come. When completed, the Buffalo Outer Harbor Parkway project, including the proposed enhancements, will mark a major step in realizing the vision of reclaiming our waterfront, transforming neglected and decaying spaces into vibrant, exciting destinations.

Project Overview

Project Status

  • The project has been Completed Project.
  • The Bid Opening was on 11/15/2007

Project Schedule

Award of Contract Original Contract Completion Date* Substantially Completed Construction Schedule Variance from Contract Award**
12/24/2007 11/30/2010 11/30/2010 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$47,347,689 N/A N/A Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: Yes

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the WESTERN NEW YORK region and includes the following:

Counties
ERIE

Cities
BUFFALO

05 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
26th Congressional District (Timothy Kennedy)

State Senatorial District(s)
63th Senatorial District (April N.M. Baskin)

State Assembly District(s)
149th Assembly District (Jonathan Rivera)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Ryan Whalen
100 Seneca Street
Buffalo, NY 14203
Phone: 716-847-3239
Email: ryan.whalen@dot.ny.gov
Provide feedback on this project