Project Details

NY 93 & 425 BRIDGE OVER E. BRANCH 12 MILE CREEK

Project ID No. 501131 , Contract Number D264117

Description

This project will replace three bridges on Rt 93 and 425 over the East Branch of Twelve Mile Creek and remove the Rt 93 Pedestrian Bridge at that location, in the Towns of Porter and Wilson in Niagara County. Route 93 is a primary southeast/northwest route. This diagonal route connects two parallel east/west state routes (NY Rte 18 & NY Rte 104) which are approximately 7 miles apart. Therefore, Route 93 is a critical link to the area serving as a major emergency and freight route to those other state routes.

Project Overview

Project Status

  • The project has been Completed Project.
  • The Bid Opening was on 12/19/2019

Project Schedule

Award of Contract Original Contract Completion Date* Substantially Completed Construction Schedule Variance from Contract Award**
02/11/2020 12/30/2021 11/01/2021 Schedule Variance Indicator

**Schedule Variance Key:
● Red - Current Schedule Variance is > 10% of Original Completion
● Yellow - Current Schedule Variance is > 5% and <=10% of Original Completion
● Green - Current Schedule Variance is within 5% of Original Completion

Construction Costs

Contract Award Cost Approved Cost Changes Current Construction Contract Cost Cost Variance of Construction Contract**
$3,627,663 N/A N/A Cost Variance Indicator

**Cost Variance Key:
● Red - Current Construction Costs are > 10% of Contract Award Cost
● Yellow - Current Construction Costs > 5% and <=10% of Contract Award Cost
● Green - Current Construction Costs are within 5% of Contract Award Cost

This project receives funding from the following sources:

Federal: Yes

State: Yes

Local: No

*Project Schedule Definitions:
Original Contract Completion Date - This is a contractual date,at the time the Contractor is Awarded the contract, representing when the Contractor is obligated to complete all of the work required in the contract and will no longer have a presence within the highway Right-of-Way.

Estimated Substantial Completion Date - This is the day the public (including vehicles and pedestrians) has full and unrestricted use and benefit of the facilities both from the operational and safety standpoint.

Location

This project is located in the WESTERN NEW YORK region and includes the following:

Counties
NIAGARA

Towns
PORTER
WILSON

05 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
26th Congressional District (Timothy Kennedy)

State Senatorial District(s)
62th Senatorial District (Robert G. Ortt)

State Assembly District(s)
144th Assembly District (Paul A. Bologna)
145th Assembly District (Angelo J. Morinello)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

Ryan Whalen
100 Seneca Street
Buffalo, NY 14203
Phone: 716-847-3239
Email: ryan.whalen@dot.ny.gov
Provide feedback on this project