Project Details

TAP 2022 ERIE BLVD WEST PEDESTRIAN AND BIKE IMPROVEMENTS, CITY OF SYRACUSE, ONONDAGA COUNTY

Project ID No. 395080

Description

This project will convert one westbound lane and shoulder along Erie Boulevard East in the City of Syracuse into a mixed-use trail/cycle track from West Genesee St. to Franklin St. Sidewalk connectivity will be improved where required, shared lane markers will be installed between West St and Franklin St where a trail is not possible. This multi-use trail will build on the existing trails constructed by both the City and State and will provide a safe multi modal (bike/pedestrian) link from the western side of the city to this system & downtown.

Project Overview

Location

This project is located in the CENTRAL NEW YORK region and includes the following:

Counties
ONONDAGA

Cities
SYRACUSE

03 Region Map

Legislative District:

This project falls within the geographical boundaries of the following legislative districts:

U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten

U.S. Congressional District(s)
22th Congressional District (John Mannion)

State Senatorial District(s)
48th Senatorial District (Rachel May)

State Assembly District(s)
129th Assembly District (William B. Magnarelli)

Statewide Transportation Improvement Program (STIP)

The Statewide Transportation Improvement Program (STIP) is a list of every project in New York State for which Federal funding is proposed to be used and that is scheduled to begin during the designated three Federal fiscal year time frame. To review the STIP Project List by Region please see the STIP Project Report.

Contact Us:

If you have questions about this project, please contact us:

TeNesha Murphy - Region 3 Public Information Officer
333 E. Washington Street
Syracuse, NY 13202
Phone: 315-428-4351
Email: tenesha.murphy@dot.ny.gov
Provide feedback on this project